Maison 192 Slideshows 1

2010

Starting the long journey

2012

Installed geothermal, radiation floor and build a basement

2013

Building the house structure with steel

2014

Sealing and insulating the whole house

2015

Finished the roof and installed all windows

2016

This is a big stage, we can finally start the interior partition and renovation. Thanks to our sponsers, we have insulated the whole house with Roxul and BP fibre boards to keep the house warm. PB has taught us a double-wall system for sound proofing. The copper pipe is a waste water heat recovery system, it will heat up the incoming water by the heat of the inhouse waste water, so as to save energy, there is also a pipe behind to collect rain water into our rainwater tank, so that we can recycle the waste water for flushing toilet.

2017

We survived an major flooding on May, while we were renovating our mezzanine windows and partio door.